Well, the last two days have been grueling work, but we've accomplished everything we wanted to. Removing the vanities proved more difficult than expected.
I removed the shut-off valves and cut the drain pipe. But, on the left vanity cabinet, they have the water coming in through the floor and the drain pipe out the back. I didn't want to cut either one of them too short and cause a problem for the plumber. But, I did need to pick one to cut (or cut the cabinet) or that cabinet was not coming out. I cut the drain pipe and hopefully, it will not be problem for the plumber.
Rachel and I installed new shut-off valves for each of the sinks. She enjoyed being able to do that. And, at the end of yesterday, everything was off the floor. It's a nice feeling.
Today started with a tougher task - removing the linoleum. That is always a pain, and today was no different. It was back straining work for me to pull up those sheets of wood with linoleum on them. But, after a couple hours, I had it all up. Luckily, I convinced Rachel that pulling up all the staples, like hundreds of them, would be fun. She was enjoying that long after her bedtime. I was reluctant to make her quit. Fewer for me in the morning sounds wonderful!
But, as you can see the bathroom is quite empty. Unfortunately, I cannot say the same for our bedroom! (Note: the vanity cabinets have now been moved to the front porch for pickup, but still....)